Realization

Project details

Power Plant Tipaza

The project was completed, USR has achieved:

A- for SNC-LAVALIN the following works:

  • Modification of the cooling circuit of the vacuum pumps of the condenser system
    From the steam turbine of unit TR// 02.

B- for IBRAHIM-CO the following works:

  • General earthwork
  • Steel structures erection as well as repairs and painting.
  • Installation and assembly of pipes.
  • Marine works
  • Repair and painting of metal frameworks and structures.
  • Maintenance and servicing of piping.
The project in pictures
Other achievements

Pumping Station C.C.C

Maintenance and Cleaning of Industrial Equipment

Installation of drilling machine

Power Plant C.C.C

Pipeline implementation

Annaba-Soukahras bypass Y bridge

Location: Tipaza
Manufacturer: SNC-Lavalin
Project owner: SKH
Customer: Ibrahim Co
Delay: 6 Months
Start of work: 02-07-2010
End of work: 21-12-2010