This project has been completed. USR has achieved:
For IBERDROLA the following works:
- Surface treatment, “Sanding and painting” of piping and supports.
- Steel structure erection, for the three units of the machine rooms.
- Earthworks of maritime platform in totality, an embankment of 5 m height, setting dike of 5000 m3 and 1000 m2 of geotextile.
- The assembly of all the piping 2500 ml of fiber pipe of diameter 2000 mm
- Horizontal drilling diameters: 300 mm, 400 mm, and 1800 mm
- Scraping works with flexible pigs for gas line of different diameters 20,18, 16,14.
- Earthworks of the roads.
- Various civil engineering works (including architecture).
For TGCTP the following works
- Assembly and installaiton of piping systems
- General earthwork
- Marine works (dyke installation, earthworks)
- Erection of steel structure (repair, maintenance)
For SARL ISEAA the following works;
- Equipment handling works
For the company SOMI Implantai srl the following works;
- Surface treatment works, sandblasting and painting for pipe supports