The project has been completed, USR has carried out the earthworks and the welding of the 48 inches diameter pipes of the gas line from the Hassi r’mel fields in the south to Taref in the north for operating.
The project has been completed, USR has carried out the earthworks and the welding of the 48 inches diameter pipes of the gas line from the Hassi r’mel fields in the south to Taref in the north for operating.





